Here are step-by-step instructions for assembling a high game system.

* We have chosen the Antec Twelve Hundred case. This three-tower fans, the blue glow from the front of the chassis. All fans with adjustable front panel. The case is also a rear 200mm fan and fan at the top of the case. Fans can from the rear of the chassis. The site is to see, and you can make one more fan.

* After the fall from the window, remove both sides of the removal of screws. Then remove the bottom of the disc with a screw bays on both sides.

* In the bay can be removed by sliding over the front of the case. This bay is a box of screws and accessories to the bay.

* Installing a hard disk (s) in the bay. In this case we have four 1 TB SATA drives from Seagate. We have two units at the bottom of the bay and two units at the top of the bay.

* The next step is to find out all the cables inside the case.

* To install the processor on the motherboard. In this case we have a central I7-920 and Asus P6T Deluxe X58 motherboard.

* In the heat sink for each of the four positions, the image on the motherboard. It is much easier to do before the board is installed.

* Now change the plate to the motherboard on the back of Antec cases.

* Add three more board work. Simply screw on the housing.

* Set card was the case with screws.

* Installation of the burner LG 22x SATA. Simply remove the cap from the tip of the screw with a LG 22x SATA burners are available.

* Run the cable from the case through the rear of the case.

* Tie the cables with tie wraps.

* Connect the cable to the motherboard.

* The use of binders to bind other cables, which in this field. Since this game from, you should try to tie all the wires from the motherboard.

* To install the TPW-1000W Antec power supply. Connect the adapter to the motherboard with a 24pin and 8pin connectors.

* Installing the VCX ASUS GTX280 1GB graphics card in the first PCI-E slot and connect the appropriate power cord.

* Connect the appropriate cable for the event, fans, hard drive and DVD recorder to LG TPW-1000.

* Use tie straps and trim with the Antec Twelve hundred, connect all cables.

* Setting -1600 Memory OCZ DDR3 1600

* At present, disconnect the system and install the O / S.